Haben Sie Fragen? Einfach anrufen, wir helfen gerne: Tel. 089/210233-0
oder besuchen Sie unser Ladengeschäft in der Pacellistraße 5 (Maxburg) 80333 München
+++ Versandkostenfreie Lieferung innerhalb Deutschlands
Haben Sie Fragen? Tel. 089/210233-0

Scheduling of a Multi-Line Steel Hot Rolling Mill

55,80 €*

Sofort verfügbar, Lieferzeit: 1-3 Tage

Produktnummer: 18cb72d244c01e4c7a893191f621f78862
Autor: Kowalski, Martin
Themengebiete: combinatorial optimization heuristic algorithms production planning scheduling stochastic optimization
Veröffentlichungsdatum: 27.02.2025
EAN: 9783844097849
Sprache: Englisch
Seitenzahl: 126
Produktart: Kartoniert / Broschiert
Verlag: Shaker
Produktinformationen "Scheduling of a Multi-Line Steel Hot Rolling Mill"
This work focuses on optimizing scheduling processes for a multi-line steel hot rolling mill producing high-alloyed steel. Characterized by a diverse product range and small batch sizes, the production faces two key challenges: determining the earliest possible start times for products in a sequence and optimizing product selection and sequencing for various scheduling scenarios. The production process, involving alternating operations on two distinct rolling lines, is modeled to represent discrete processing stages, enabling detailed and efficient simulations. A new method for calculating optimal start times is introduced, accounting for both deterministic and stochastic processing times. This approach reduces total production time and avoids no-wait violations, which occur when products experience unplanned waiting times during critical processing stages. Analytical solutions address smaller systems, while Monte Carlo simulations manage larger setups. Practical validation confirmed the method’s effectiveness. The work also addresses the generation of optimized production schedules for groups of jobs processed alternately on the two rolling lines. This scheduling challenge, incorporating elements of the Traveling Salesperson and Orienteering Problems, is solved using a simulated annealing metaheuristic and local search. The algorithm minimizes unproductive times, maximizes the use of retooling intervals, and adheres to complex production rules. A prototype planning tool tested in real operations demonstrated significant time savings and improved efficiency. The research underscores the advantages of systematic, computer-aided optimization in reducing idle times and managing intricate scheduling tasks in industrial steel production.

Sie möchten lieber vor Ort einkaufen?

Sie haben Fragen zu diesem oder anderen Produkten oder möchten einfach gerne analog im Laden stöbern? Wir sind gerne für Sie da und beraten Sie auch telefonisch.

Juristische Fachbuchhandlung
Georg Blendl

Parcellistraße 5 (Maxburg)
8033 München

Montag - Freitag: 8:15 -18 Uhr
Samstags geschlossen